ONE-STOP SERVICE
Our service team supports investors from the establishment phase and throughout the entire project operation process.
Frequently Asked Questions
1.
How are the plot areas in the Industrial Park divided?
2.
For a large area exceeding 50 hectares, additional land for phase 2 is needed. When can phase 2 land be handed over?
3.
What is the design load of the road traffic system within the Industrial Park?
4.
Besides the connection point on the main trunk road, does the Industrial Park have any other traffic connection points to National Highway 1B?
5.
What is the water supply capacity of the Industrial Park?
6.
What is the power supply capacity of the Industrial Park?
7.
What is the geological condition of the Industrial Park area?
8.
Khu công nghiệp có hỗ trợ kết nối lao động địa phương không?
Document list
20/04/2026
Planning map of Phu Vinh Industrial Park land plot
20/04/2026
PHU VINH INDUSTRIAL ZONE (Vietnamese)
20/04/2026
PHU VINH INDUSTRIAL ZONE (English)
20/04/2026
PHU VINH INDUSTRIAL ZONE (Simplified Chinese)
20/04/2026
PHU VINH INDUSTRIAL ZONE (Traditional Chinese)
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.

